检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]太原理工大学矿业工程学院,山西太原030024
出 处:《煤炭工程》2014年第7期34-36,共3页Coal Engineering
摘 要:针对长平煤矿高水平应力条件下大断面沿底留顶巷道难以支护的现状,通过地应力测试、钻孔窥视、数值模拟等方法进行了巷道顶板围岩破坏分析。根据分析的结论,提出43042巷道沿顶布置支护方案,并通过设置测站实测表面位移、顶板离层、测力锚杆等方法对其稳定性进行了分析,验证了43042巷道支护方案的合理性。Aiming at the condition in Changping mine that the support is difficult under high horizontal stress for the largecross section roadway along the bottom with top coal remained, stress testing, drilling peep, numerical simulation andother methods were applied to analyze the surrounding rock failure of roadway roof. According to the conclusions, thesupporting scheme of 43042 roadway along the top was proposed, and the stability of the support was analyzed by settingobservation station to measure surface displacement, roof separation, rock - bolt dynamometer and other methods, thestability were analyzed to verify the rationality of 43042 roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112