连采工作面胶结充填开采工艺  被引量:4

Cemented Filling Mining Process Applied in Continuous Coal Mining Face

在线阅读下载全文

作  者:刘鹏亮[1] 孙凯华[1] 尚培 

机构地区:[1]天地科技股份有限公司开采设计事业部,北京100013 [2]贵州能化公司青龙煤矿,贵州毕节551500

出  处:《煤炭工程》2014年第7期52-54,共3页Coal Engineering

基  金:中国煤炭科工集团有限公司科技创新基金项目(2011MS014);天地科技股份有限公司开采设计事业部生产力转化基金(KC-SCLZH-2012-04);天地科技股份有限公司开采设计事业部生产力转化基金(KJ-2013-TDKC-10)

摘  要:针对连采面资源回收率较低的问题,结合其采空区已采支巷和煤柱相间布置的特点,发明了将开采和充填都分为两个阶段的胶结充填开采技术原理和工艺,提出了提高支巷充填接顶率的技术措施。现场工业性试验表明,充填连采面支巷开采和充填工艺实施顺利,实现了煤柱安全回收。Aiming at the problem that, the resource recovery rate of continuous mining face was low, combining with thearrangement characteristic of goal, mined branch roadway alternated with coal pillar, the principal and process ofcemented filling mining technology were proposed, in which the mining and filling were divided into two stages, thetechnical measures to improve the branch roadway roof contacted rate of filling. The industrial test showed that, theproposed process was implemented smoothly, realizing safe coal pillar recovery.

关 键 词:连采充填工作面 分阶段充填开采 胶结充填开采工艺 充填与开采平行作业 充填体接顶率 

分 类 号:TD823.7[矿业工程—煤矿开采]

 