Long-term settlement prediction of high-speed railway bridge pile foundation  被引量:4

Long-term settlement prediction of high-speed railway bridge pile foundation

在线阅读下载全文

作  者:杨奇 冷伍明 张升 聂如松 魏丽敏 赵春彦 刘维正 

机构地区:[1]School of Civil Engineering,Central South University [2]Mobile Post-doctoral Stations of Traffic and Transportation Engineering,Central South University

出  处:《Journal of Central South University》2014年第6期2415-2424,共10页中南大学学报(英文版)

基  金:Project(2012QNZT050)supported by the Special Fund for Basic Scientific Research of Central Colleges,China;Projects(51208518,U1361204,51208519,51108464)supported by the National Natural Science Foundation of China;Project supported by the Postdoctoral Foundation of Central South University,China;Projects(2013RS4030,2012RS4002)sponsored by Hunan Postdoctoral Scientific Program,China

摘  要:The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis, and the corresponding loading function was presented. One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading. Moreover, the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform. The three-dimensional composite analysis method of bridge pile group was improved, where the actual load conditions of pile foundation could be simulated, and the consolidation characteristics of soil layers beneath pile were also taken into account. Eventually, a corresponding program named LTPGS was developed to improve the calculation efficiency. The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated, and a close agreement is obtained. The error between computed and measured results is less than 1 mm, and it gradually reduces with time. It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.

关 键 词:bridge pile foundation long-term settlement CONSOLIDATION Laplace numerical inversion transform multilevel loading multilayered soils 

分 类 号:U443.15[建筑科学—桥梁与隧道工程] U446[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象