检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州市地下铁道总公司,广州510380 [2]暨南大学力学与土木工程系,广州510632
出 处:《广州建筑》2014年第3期26-32,共7页GUANGZHOU ARCHITECTURE
摘 要:基于广州地区典型软硬复合地层条件下的盾构掘进工程实践,分析研究了盾构掘进过程中存在的刀盘刀具磨损、姿态难控制、结泥饼和喷涌等施工风险,从盾构选型、刀具配置与管理、掘进参数控制、盾构姿态控制、渣土改良与同步注浆及信息监测与反馈等方面采取应对措施,并以广州地铁二号线越~三区间盾构隧道施工为例进行说明.Based on the shield tunneling projections in mixed face ground condition with soft and hard rock of Guangzhou, construction risks including wear of cutterhead and tool, attitude difficult to control, mud cake and spewing existed during tunneling are analyzed. Response measures are taken to control risks from shield selection, configuration and management of tool, tunneling parameter control, shield attitude control, sediment improvement and synchronous grouting, information monitoring and feedback. Shield tunneling of Yuexiu-Sanyuanli interval in Guangzhou metro No.2 line is taken as an example to explain.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15