检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学深圳研究生院,深圳518055 [2]清华大学环境学院,北京100084 [3]清华大学国家环境保护环境微生物利用与安全控制重点实验室,北京100084
出 处:《Journal of Southeast University(English Edition)》2014年第2期143-149,共7页东南大学学报(英文版)
基 金:The National Science and Technology Major Project of China(No.2012ZX07301-001);the Shenzhen Environmental Research Project,China Postdoctoral Science Foundation(No.2013M530642)
摘 要:An innovative approach based on water environmental capacity for non-point source NPS pollution removal rate estimation was discussed by using both univariate and multivariate data analysis.Taking Shenzhen city as the study case a 67% to 74% NPS pollutant load removal rate can lead to meeting the chemical oxygen demand COD pollution control target for most watersheds.In contrast it is hardly to achieve the ammonia nitrogen NH4-N total phosphorus TP and biological oxygen demand BOD5 pollution control target by simply removing NPS pollutants. This highlights that the pollution control strategies should be taken according to different pollutant species and sources in different watersheds rather than one-size-fits-all .以深圳市为例,采用单元分析与多元分析相结合的手段,探讨了一种基于城市水环境容量估算面源污染负荷削减率的方法在环境规划中的实际应用。计算结果表明:对于COD指标,67%~74%的面源污染负荷削减率即可满足深圳市规划后环境容量的限制;而对于NH4-N, TP和BOD5,仅依靠削减面源污染负荷则无法满足规划要求。因此,在城市水环境质量规划过程中,应针对不同流域及目标污染物种类,制定“量体裁衣”式的水环境控制策略,而非采用一成不变的措施。
关 键 词:environmental capacity estimation non-point source (NPS) pollution removal rate control strategy
分 类 号:X321[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145