小浪底大坝工程进度控制实践  被引量:1

Construction schedule control of the Xiaolangdi dam project

在线阅读下载全文

作  者:周俊[1] 

机构地区:[1]国家电力公司西北勘测设计研究院,西安710065

出  处:《西北水电》2001年第1期57-60,共4页Northwest Hydropower

摘  要:小浪底水利枢纽大坝工程施工进度进展顺利 ,各主要项目一直超前合同目标计划。工程师通过对目标合同计划的审核 ,根据施工实际情况对施工计划适时修改 ,牢牢把握施工中的一些关键项目和控制点 ,并采取了相关措施 ,如 :加强对承包商的技术指导、积极支持改进、正确处理设计变更等 ,保证了施工进度 ,取得提前The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.The Engineer,by reviewing the contractual target schedule,timely modifying the schedule based on the practical construction conditions and firmly grasping the key items and controlling links,has adopted corresponding measures,such as providing technical instruction to the contractor,actively support design improvement and properly dealing with design changes,and thus the construction schedule is ensured and completion of the project one year ahead of schedule is succeeded.

关 键 词:小浪底水利枢纽工程 施工进度控制 施工设备 

分 类 号:TV511[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象