地下洞室群施工程序的仿真模拟研究  被引量:3

Study on Construction Procedure's Emulation of Underground Multi-tunnel and Multi-champer

在线阅读下载全文

作  者:杨兴国[1] 谭德远[2] 

机构地区:[1]四川大学水电学院,四川成都610065 [2]深圳市政府投资项目审计中心,广东深圳518026

出  处:《四川大学学报(工程科学版)》2001年第2期1-4,共4页Journal of Sichuan University (Engineering Science Edition)

基  金:国家九五科技项目子题! (96 2 2 1 0 5 0 5 0 3 )

摘  要:介绍以随机的生产线平衡原理 ,动态数组和公共时钟为基础 ,结合地下工程施工特点和经验总结而开发的 ,用于地下洞室群施工程序仿真模拟的系统 ,该系统具有能够快捷地实现对施工系统的仿真模拟等特点 ,应用于小湾超大型地下厂房洞室群施工程序模拟 。This paper describes a system which is based on random production chains equilibrium priciple, dynamic array and common clock,which considered the characteristics and experence of underground engineering's construction,and which is applied to eimulate the construction procedure of underground multi tunnel & multi chamber. The system can conveniently realize the construction system, acquire the quantitative parameters for the comparison of construction procedure, and is in favor of the unification of contruction technique and management. When the system is applied to the multi tunnel & multi chamber in the super large underground plant buildings of Xiaowan, the results shows good effect. The achievements are of important instructive significance for the next stages optimum design and construction of Xiaowan hydroplant.

关 键 词:地下洞室群 施工程序 仿真模拟 动态数组 公共时钟 

分 类 号:TU94[建筑科学—建筑技术科学] TP391.9[自动化与计算机技术—计算机应用技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象