三峡永久船闸人字门顶枢预应力锚杆安装的难点分析及方案优化  被引量:3

Analysis on the installation difficulties of pre-stressed anchorage rod for the top pintle of miter gate of Three Gorges Permanent Lock and its alternative optimization

在线阅读下载全文

作  者:苏存明[1] 王俊[1] 

机构地区:[1]武警水电第二总队第十支队,江西新余338029

出  处:《水力发电》2001年第3期32-34,共3页Water Power

摘  要:三峡永久船闸人字门顶枢预应力锚杆安装是三峡永久船闸金属结构和机电设备预埋件中难度最大的项目。工程采用的在人字门顶枢A、B拉架预留槽内预埋预应力锚杆的设计方案 ,在国内尚属首例。技术人员对安装工程的难点认真分析 ,对方案进行数次优化 ,圆满完成了任务 ,为我国人字形工作闸门顶枢预应力锚杆的安装积累了宝贵经验。The installation of pre stressed anchorage rod of top pintle of the miter gate of Three Gorges Permanent Lock is the most difficult item in the metal structures and mechanical and electrical equipment of Three Gorges Permanent Lock. The design scheme of installing pre stressed anchorage rod in the channels of A and B tension bar in the top pintle of miter gate has been adopted, which is the first one at home. The technicians seriously analyzed the installation difficulties and optimized the scheme so that they successfully completed the project construction task. It provides valuable experience for the installation of pre stressed anchorage rod in the top pintle of miter gate in China.

关 键 词:人字门 闸门顶枢 预应力 锚杆 安装 永久船闸 三峡工程 

分 类 号:TV547.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象