鲁07井水位对固体潮滞后的处理  被引量:3

PROCESS OF PHASE IAG IN WATER LEVEL TO THE EARTH TIDE IN WEII LU-07

在线阅读下载全文

作  者:张昭栋[1] 耿杰[1] 王昌文[2] 张铸钢 

机构地区:[1]山东省地震局 [2]山东省计算中心

出  处:《华南地震》1991年第1期23-27,共5页South China Journal of Seismology

基  金:地震科学联合基金资助课题

摘  要:本文给出了一种计算考虑滞后影响的井水位固体潮系数的新方法。导出了计算固体潮系数和滞后时间的公式,给出了考虑滞后影响的井水位固体潮校正公式。以鲁07井为例,用该法求出其井水位固体潮系数为16.5mm/10^(-8),水位对固体潮响应的滞后时间为0.48小时。与以前的回归分析方法相比,校正后的水位中误差明显减小,校正效果比较好。In this paper, a new method of calculating the lag influ-ence of the tidal coefficient in the well level is given. The formulas of calculating the tidal coefficient and lag time are developed, and the corrected formulas of lag influence of tide in the well level are given. The well Lu-07 is instancied.By using this method,we have calculated that the tidal coefficient of the well level is 16.5mm/10-8 and the lag time of the response of water level to the tide is 0.48 h. The standard deviation of the water level corrected by the tide evidently decreases and the results of the water level are better than the former method of the regression analysis.

关 键 词:固体潮系数 滞后时间 地下水位 地震前兆 精度 

分 类 号:P315.723[天文地球—地震学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象