检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾俊昌[1]
机构地区:[1]中南电力设计院,武汉市430071
出 处:《电力建设》2001年第4期18-22,25,共6页Electric Power Construction
摘 要:紧凑型线路施工和普通输电线路一样 ,在紧线观测弛度中总是存在误差 ,三相导线弛度不可能完全一致 ,安装相间间隔棒后 ,在安装点使其三相间距相等 ,必然导致各相导线荷载、张力、弛度发生变化 ,达到新的平衡。文章探讨了紧凑型线路安装相间间隔棒后的导线荷载分配量、导线张力、弛度的计算方法。The construction of compact-type transmission line is the same as construction of conventional lines.The errors always occur in observing the sag during line tensioning and the sags of conductors in three phases can not be completely identical.After installation of phase to phase spacers the equal distance among three phases at the installing point will certainly result in variation of load,tension and sag of each phase conductor to reach the new balance.The paper discusses the calculation method for conductor load distribution,tension and sag after installation of phase to phase spacers on compact type transmission lines. [
关 键 词:紧凑型线路 间隔棒 荷载分配量 导线张力 弛度 计算方法
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.221