检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]青岛振业建筑设计院 [2]青岛建筑工程学院
出 处:《给水排水》2001年第5期78-80,共3页Water & Wastewater Engineering
摘 要:通过对某高层住宅PVC U排水管道安装质量存在的问题进行现场调查 ,利用排列图找到了影响安装质量的主要因素 ,然后采用因果分析图法分析了导致这些质量问题产生的原因 ,并提出了相应的对策和措施。A field quality investigation to examine the installation of PVC U drainage pipeline in a high rise building was conducted jointly by the designers and constructors. The main factors affecting installation quality were found by a permutation diagram and the reasons that caused these failures were analyzed by causality analysis methods. Finally an appropriate way and some consolidated measures were given to deal with these problems.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15