检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《四川水力发电》1993年第3期45-50,共6页Sichuan Hydropower
摘 要:二滩拱坝泄洪中孔工作弧门支承结构具有承受水头高、水推力大、高速水流震动影响及检修困难等特点。为改善其应力状态,确保泄洪消能安全,设计采用预应力锚固技术。本文简要介绍工作弧门支承结构和预应力锚索设计的成果,并运用三维有限元法对其应力分布规律进行了研究,为设计提供依据。Service radial gates at middle level outlets on Ertan arch dam featrues high head bearing,high water thrust bearing,vibrating effecting by high speed flow and difficult maintenace. Pre-stressed anchor tech-nology is used to improve the stress condition for safe performance of flood release and energy dissipation. The paper briefly introduces the design and research of bearing structures and pre -stressed anchor line for the service radial gates and analyzes the stress distribution pattern by using three-diminsional finite element method to provide design considerations.
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3