瀑布沟工程的水文分析计算  

Hydrologic Analysis for Pubugou Hydropower Project

在线阅读下载全文

作  者:晏云鹏 

机构地区:[1]成都勘测设计研究院

出  处:《四川水力发电》1992年第4期43-50,共8页Sichuan Hydropower

摘  要:本文简要的介绍了瀑布沟工程水文分析计算主要依据站的选定和基本资料的插补延长,以及径流、洪水的分析计算方法.在可行性研究阶段水文成果(通过审查)和新设立的毛头码水文站所取得的数年水文资料的基础上,将初设阶段对可行性研究阶段的水文分析计算方法和成果进行验证和补充的情况重点予以介绍.Selection of gauging stations where main hydrologic analysis considerations for Pubugou Project were obtained.the extrapolation of interpolation of the basic data,analysis method for runoff and flood are briefly introduced. Based on hydrologic data results obtained at feasibility study stage (passed examination) and long-term hydrologic data obtained in newly-established Maotouma Gauging Station,the fact is described in detail that the hydrologic analysis methods and results in feasibility study stage were checked and compl-mented in Preliminary Design Stage.

关 键 词:瀑布沟电站 水文分析 径流洪水 

分 类 号:P332[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象