检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邢卫国[1] 林继铿[1] 文福拴[1] 倪以信[1] 吴复立[1] 舒立平[2] 程卫生 舒乃秋[2] 陈允平[2]
机构地区:[1]香港大学电机电子工程学系 [2]武汉大学电气信息学院,武汉430072
出 处:《电力系统自动化》2001年第11期12-16,共5页Automation of Electric Power Systems
基 金:国家重点基础研究专项经费(G1998020305);香港政府大学研究基金(RGC);香港大学研究基金(CRCG)
摘 要:中国电力工业正面临着重大的市场化改革,跨大区的三峡电力市场建设势在必行。由于三峡电力市场的跨大区性质,及考虑到未来中国电力市场的建设,电力市场的层次结构是一个十分重要、值得探讨的问题。文中首先提出了三峡电力市场的设计原则,进而借鉴国际电力市场设计和运行的经验教训,依据中国电力工业的现状和可能的发展趋势,分析了未来中国电力市场架构的3种可能性:一是国家和省市两级电力市场;二是国家和大区两级电力市场;三是国家、大区和省市三级电力市场。建议在逐步建立国家电力市场并在相当长的一段时间内采用国家-大区-省市三级电力市场的同时,应发展和加强大区的电力市场,最终过渡到国家-大区两级电力市场。在此基础上,进一步讨论了三峡电力市场的结构和市场参与者。The Three Gorges Power Market (TGPM) will be the first cross-region power market in China. A vital problem is how to design an appropriate bulk power market structure. Based on international experiences on power market designs and the current situations of China's power industry, the hierarchical structure for China's power markets is first discussed. There are basically three alternatives. i. e., the state-province (or city) two-layer structure, the state-region two-layer structure and the state-region-province (or city) three-layer structure. It is suggested that the state-region-province (or city) three-layer structure be adopted at the initial stage of the restructuring. While this stage. the regional power markets should be reinforced progressively and the final structure should be the state-region two-layer model. Based on this proposal, the structure and market participants of TGPM are next suggested. This project is supported by National Key Basic Research Special Fund of China (No. G1998020305). the Research Grant Council (RGC), Hong Kong SAR Government, and the Committee of Research and Conference Grant (CRCG), the University of Hong Kong.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28