丰满大坝溢流坝段增设排水系统设计研究  

Study of design of adding drainage system in section of Fengman spillway dam

在线阅读下载全文

作  者:黄蔚[1] 刘迎曦[1] 周承芳[1] 

机构地区:[1]大连理工大学工业装备结构分析国家重点实验室,辽宁大连116024

出  处:《大连理工大学学报》2001年第3期363-367,共5页Journal of Dalian University of Technology

基  金:国家自然科学基金资助项目!(5 97790 0 3)

摘  要:以渗流分析和有限元理论为基础 ,对丰满大坝溢流坝段为降低下游面冻融点位置所提出的增设排水系统的若干设计方案进行了可行性研究 .结果表明 ,新增排水廊道、加密排水幕及优化排水孔的合理位置的设计方案均对降低出水点有不同程度的效果 ,但都不能达到使其淹入下游面以下的目的 .其主要原因是由最初的设计方案造成的 .This paper proposes a new FEM of three dimensional unconfined seepage analysis, called abandoned element method. With the help of leakage information of the observed hole inside the dam, the seepage coefficients of the different parts of the dam have been identified by inverse analysis. The feasible design programs about adding drainage in Fengman spillway dam are discussed in order to lower the freezing point location below the water surface of lower reaches. The profitable conclusion has been drawn before the implementation in engineering.

关 键 词:溢流坝 无压渗流 排水系统 反分析 水库 有限元 混凝土重力坝 

分 类 号:TV652.11[水利工程—水利水电工程] TV642.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象