出 处:《新技术新工艺》2001年第5期3-6,共4页New Technology & New Process
摘 要:指出了新的市场环境下标准 MRP 的固有不足 ,简述了 TOC理论及其计划与控制原理 ,提出了一种基于 TOC理论和 MRP 的混合式计划系统 ,以改善 MRP 的实时特征 ,最大限度地压缩各阶段的提前期。论述了该混合系统中 TOC思想与 MRP 系统的结合原则 ,简介了系统的组成与运作 ,描述了混合系统中 DBR(鼓 -缓冲区 -绳 )、作业排程、作业批量与提前期确定等几方面的运作原理和特征。This paper briefly pointed out the deficiencies of standard MRPII under the new market developing, and summarized the Theory of Constraints (TOC) and its principles for production planning and control. Here presented a hybrid planning system based on MRPⅡ in conjunction with TOC, through which the standard MRPⅡ system will be endowed with the performance of real time and the lead time of each stage will be farthest cut down. This paper discussed the principles constituted the hybrid system in conjunction TOC with MRPⅡ in detail, briefly introduced the operation and buildup of the hybrid system, described the operation elements and their characters of DBR(Drum buffer Rope), shop floor scheduling, lot size as well as lead time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.244.250