秦沈客运专线建设过程中的水土流失实验研究  被引量:15

Study on Water and Soil Loss During Procession of Constructing Qinhuangdao Shenyang Special Line for Passengers Train

在线阅读下载全文

作  者:叶翠玲[1] 许兆义[1] 杨成永[1] 

机构地区:[1]北方交通大学,北京100044

出  处:《水土保持学报》2001年第2期9-13,共5页Journal of Soil and Water Conservation

基  金:铁道部基金项目!"铁路工程水土流失评价方法研究"

摘  要:针对铁路建设过程中的典型坡面进行了野外人工模拟降雨实验 ,以定量研究铁路施工引起的水土流失量。实验结果表明 :(1)弃渣小区入渗率大 ,在试验雨强下没有产流。但在有上坡来水的情况下 ,极易发生沟蚀 ,次降雨侵蚀量可达 45 0 kg/ m2 ,远远大于其它坡面面蚀的侵蚀量 ;(2 )在实验雨强下 ,各小区的产沙量依次为 :对大雨强 ,施工路堑 >施工便道 >施工营地 >荒坡小区 ;而对小雨强 ,施工路堑 >施工营地≥荒坡小区 >施工便道。路堑小区的产沙量明显大于其它各小区 ,为铁路施工期水土流失防治的重点坡面 ;(3)各小区的累积产沙量与时间 。The artificial rainfall experiment has been designed for analysing erosion of typical slopes during the railway construction, to quantify the runoff and soil loss.The results prove that the sediment yield of the dumped soil plot is much larger than any other plot, and aliable to develop rill erosion. The another is the surface erosion yield of the uncovered slope plot is much larger than that of nature slope,the constructing road and rentation.

关 键 词:铁路建设 典型坡面 水土流失 人工模拟降雨 产沙过程 侵蚀方式 

分 类 号:S157.1[农业科学—土壤学] U215[农业科学—农业基础科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象