检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:窦庆和[1] 魏群[1] 郭明江[1] 聂世锋[1]
机构地区:[1]安阳钢铁集团有限责任公司
出 处:《钢铁》2001年第3期9-11,共3页Iron and Steel
摘 要:安钢 5× 30 0 m3高炉从 1995年 9月开始喷煤 ,1997年喷煤比达到 78kg/ t,为进一步提高喷煤量和降低生铁成本 ,在对原喷煤系统进行改造和完善的基础上 ,选择了合适的煤种 ,原燃料质量进一步改善 ,1998年 3月 4日开始了烟煤无烟煤混喷试验 ,并取得成功 ,现烟煤配比稳定在 75 %以上 ,达到了节能、降耗、增效的目的。The pulverized coal injection system was put into operation on five 300 m 3 BFs at Anyang Iron and Steel Group Co., Ltd. in September, 1995. The average coal injection rate reached 78 kg/t in 1997. A series of measures, such as modernizing the PCI system, improving coke quality, selecting the suitable coal, are adopted to raise coal injection rate. The bituminous and anthracite mixed injection system was adopted on March 4, 1998. It proved success. At present the proportion of bitumite in the mix is over 75 %. The coke saving and productivity increasing has been obtained.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4