检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国空气动力研究与发展中心,四川绵阳621000
出 处:《流体力学实验与测量》2000年第1期102-108,共7页Experiments and Measurements in Fluid Mechanics
摘 要:为了恢复 8m× 6m风洞动力系统的负载能力 ,提高其稳定性与可靠性。利用两套额定值为 485V、30A的小功率调速装置 ,通过改造 ,控制两桥串联的大功率晶闸管整流柜 ,驱动 2 60 0kW直流电动机实现转速控制 ,从而将 8m× 6m风洞模拟调速系统成功地改造成全数字调速系统。结果表明 :通过改造进口小功率全数字装置 ,实现对大功率调速系统的全数字控制 ,其投资与模拟调速系统的相当 ,而技术上达到了世界上In order to resume the load ability of power system in 8m×6m wind tunnel , improve its stability and reliability, the original analog speed regulated system of 8m×6m wind tunnel has been successfully reformed recently.The new system realize fully digital controlling for 2600kW DC motor ,by rebuilding two sets of 485V、30A speed regulated equipment for controlling large power thyristor based rectifier of 2 stage cascade. The result makes clear that, by rebuilding little power fully digital equipment, large power speed regulated system realizes fully digital controlling, the investment is equivalent to that of the analog speed regulated system, the technique level come up to 90'S world standards.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249