临时矿壁结构的可靠性  被引量:16

Reliability analysis of temporary ore wall structure in non-pillar continuous mining

在线阅读下载全文

作  者:邓建[1] 古德生[2] 李夕兵[2] 

机构地区:[1]同济大学地下建筑与工程系,上海200092 [2]中南大学资源环境与建筑工程学院,长沙410083

出  处:《中国有色金属学报》2001年第4期671-675,共5页The Chinese Journal of Nonferrous Metals

摘  要:临时矿壁的稳定性直接影响无间柱连续采矿技术的贫化率和损失率 ,进而决定该试验技术的成败。采用确定性分析法分析采矿结构的稳定性 ,由临时矿壁的力学分析建立临时矿壁的抗倾覆条件极限状态方程和强度条件极限状态方程 ,进行临时矿壁稳定可靠性分析 。The temporary ore wall exerts the direct control of the dilution rate and loss rate for non pillar continous mining method, and then it is decided that whether this experimental mining method is successful or not. The deterministic methods are generally used in stability analysis of mining structures. Based on deterministic methods, anti overturn limit state equation and strength limit state equation were established through a thorough mechanical analysis of temporary ore wall. The reliability analysis of this ore wall was conducted, and a few conclusions which were proved useful to mining engineering were obtained.

关 键 词:无间柱连续采矿 临时矿壁 可靠性分析 抗倾覆 

分 类 号:TD32[矿业工程—矿井建设] TD853

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象