检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘永锋[1]
机构地区:[1]广州四航工程技术研究院,广东广州510230
出 处:《水运工程》2001年第8期23-27,共5页Port & Waterway Engineering
摘 要:采用波动方程法模拟打桩过程中承载力、贯入度、拉应力和压应力、桩输入能量的变化,以便了解打桩过程中可能出现的问题,并提出解决方法。打桩全程的分析,可以了解打1根桩的时间和总锤击数,以便安排打桩工作。Wave equation was adopted to simulate the bearing capacity, penetration, tensile stress and compressive stress of pile, as well as variation of pile energy input during pile driving, so as to find the problems possibly appeared during piling and advance relevant solutions. Through analyzing the whole process of piling, we can know the time and total times of hamming needed for driving one pile, which will provide a reference for arrangement of pile driving.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143