检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:盛洪飞[1]
机构地区:[1]哈尔滨建筑工程学院
出 处:《冰川冻土》1989年第1期44-52,共9页Journal of Glaciology and Geocryology
摘 要:本文在调查研究及实际工程验证的基础上,对桥梁基桩抗冻拔验算提出了新的建议。其中包括:给出符合桥梁工程应用要求的单位面积切向冻胀力值表,提出在总切向冻胀力计算中必须考虑标准冻深修正系数n_Т,分析冻结过程在冻结界面作用冻胀反力而形成的暖土部分桩土作用机制及摩阻力计算性质,冻结线以下桩身自重按一半考虑等问题。Based on investigations and practical project experiments, some new ideas on the check of anti-frost heaving of bridge foundation piles are proposed and their principal contents have been admitted into the new revised edition of the Design Code of the Base and Foundation of Highway Bridge and Culvert. The values of the tangential frost heaving force on bridge structure presented in this paper are based on the hydrogeologic characteristics of the bridge structure and determined according to the envelope of the actual values measured recently in our country. The frost depth is variable, so that the standard frost depth should be taken in design. When calculating tangential frost heaving force, it is suggested that a revised coefficient nTof the standard frost depth should be used. According to the stress state of a pile under the action of frost heave, it is pointed out that the value of friction between the pile and warm earth determined on the basis of a general axial tensile pile is wrong . It should be determined on basis of a general axial compressed pile. On the basis of actual test conditions under which the value of friction between pile and soil is determined, only half of the pile weight below freezing front should be considered.
分 类 号:U442.51[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40