倒落抱杆整立杆塔最优吊点的确定准则  被引量:2

Principles to Determine the Optimum Hoisting Points for Pole-towers Erected Completely with Inverted Holding Poles

在线阅读下载全文

作  者:刘树堂[1] 刘智勇 彭雅轩[1] 

机构地区:[1]东北电力学院,吉林市132012 [2]广州电力设计院,广州市510075

出  处:《电力建设》2001年第5期18-20,26,共4页Electric Power Construction

摘  要:倒落抱杆整立杆塔施工中 ,吊点位置的确定是一项非常重要的设计内容。采用“弯曲应变能最小”准则 ,搜索最优吊点位置 ,可显著降低杆塔最大截面弯矩 ,使之满足杆塔结构强度及抗裂要求。该法适用于任意多吊点、任意荷载、任意变截面等多种情况。For construction of complete pole-tower with inverted holding poles the determination of hoisting points is a very important design content.Applying the principle of “minimum bending strain energy”to seek for the optimum location of hoisting points can obviously reduce the maximum sectional bending moment,which can meet the requirements for structural strength and anti-crack of pole-towers.The method is suitable for many conditions of optional multiple hoisting points,optional load and optional variable sections.[

关 键 词:倒落抱杆 整立杆塔 弯曲应变能量小准则 输电线路 绝缘子 

分 类 号:TM753[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象