检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘华印[1]
机构地区:[1]中国石油天然气股份有限公司规划总院
出 处:《石油规划设计》2001年第5期6-9,共4页Petroleum Planning & Engineering
摘 要:西气东输工程是我国西部大开发的序幕性工程为了做好可研工作采用了设计联合体的项目组织型式和国际上通用的项目管理模式为保证水平和质量进行了深入的调查研究和广泛的专家咨询采用了高压输气技术内涂层技术高等级材质和先进的自控系统等新技术并在市场波动规律研究管道系统可靠性研究等方面与以往输气管道可研相比有所突破s West-to-East Gas Pipeline project is the prologue of theWest China intensive development program. To fulfill the FS, used the project organization mode of engineering association and theinternational practiced mode of project management. To ensure thestandard and quality, carried out the detail investigation and wide expert consulting, adopted high transmission pressure, inside coating, highgrade steel material and advanced automatic control system. There are breakthrough aspects in comparison with the past gas pipeline FS, such as the survey of the market waving tendency, the survey of thereliability of the pipeline system. 6
分 类 号:TE973.9[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117