出 处:《中国工程科学》2000年第12期84-89,共6页Strategic Study of CAE
摘 要:介绍了我国大坝建设的发展和特点 ,概括了高坝建设中的地质勘探、坝工技术、泄洪消能、坝基处理和高边坡处理等方面的科技成果和应用水平 ,展望了我国高坝发展前景并指出今后高坝科技攻关重点。The development and characteristics of high dams construction in China are introduced. The scientific and technological achievements and their application in geologic exploration, dam construction,flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slope,etc., are also described. The developing trends of high dams in the future are presented and the key research works on science and technology of high dams are indicated. According to the incomplete statistical data, about 24 000 dams over 15 m in height have been constructed, and there are 16 dams with height over 150 m to be completed or under construction.They in clude the 181 m-high concrete gravity dam in the Three Gorges Project,the 240 m-high Ertan double curvature concrete arch dam,the 178 m-high Tianshenqiao No.1 CFRD,the 182 m-high Hongjiadu CFRD,the 233 m-high Shuibuya CFRD,the 130 m-high Shapai RCC arch dam,the 131 m-high Jiangya RCC gravity dam,etc. [
关 键 词:水力发电 高坝 重力坝 拱坝 碾压混凝土坝 面板堆石坝 技术发展 地质勘探 坝工技术 泄洪消能
分 类 号:TV641.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222