检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省建设集团设备安装公司 [2]河北建筑工程学院
出 处:《河北建筑工程学院学报》2000年第1期47-53,共7页Journal of Hebei Institute of Architecture and Civil Engineering
摘 要:结合安装施工经验和国内外的新进展,对建筑工程和设备安装工程中的接地系统安装工艺方法进行了介绍.文中介绍了土壤特性对接地系统的影响,给出了常见土壤的电阻率,提出了接地电阻的正确测量方法和接地故障电流的监测方法.此外还介绍了几种专用设备设施的接地系统安装.In the paper, according to the installing experience and the current development home and abroad, the installing technical methods of ground wire system are introduced. The effects of soil characteristics on ground wire system are discussed, the resistivities of common kinds of soil are given, the correct determining method of grounding resistance, the watching and measureing method of trouble electric currents are given and the installing methods of ground wire system of some special equipment are introduced.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28