生产矿井采掘计划的预测检验  被引量:1

PREDICTION AND EXAMINATION OF MINING AND DEVELOPMENT PLAN FOR PRODUCTION MINES

在线阅读下载全文

作  者:蒋国安[1] 李兴华[1] 

机构地区:[1]山东矿业学院

出  处:《煤炭学报》1991年第3期29-35,共7页Journal of China Coal Society

摘  要:本文采用时间序列分析的方法来预测回采面的终采日期和掘进准备面的完工日期,通过比较这两个日期,以检验矿井采掘关系的状态,为编制和检验协调的采掘接替计划提供依据。并且编制了计算机软件,只要输入采掘工作面的原始数据和约束条件,即可随时对矿井采掘关系进行动态检验。This paper describes a time series analysis method for predicting the final pro-duction date of a working face and the completion date of a new coal face,and forexamining the relation between mining and development by comparing these twodate,which provides a basis for drawing up a coordination mining and replacementplan.A computer software is written and it can be used to dynamically examine therelation between coal extraction and development of mines at any time,provided theoriginal data and constraint conditions of the coal face and heading face are inputted.

关 键 词:矿井 采掘计划 预测 检验 煤矿 

分 类 号:TD822[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象