USLE用于估算工程建设项目水土流失量的讨论  被引量:8

Discussions on Estimating the Quantity of Soil and Water Loss During Engineering Construction By Using USLE

在线阅读下载全文

作  者:叶翠玲[1] 许兆义[1] 董瑞锟[2] 周鹤 

机构地区:[1]北方交通大学土建学院,北京100044 [2]重庆大学土木工程学院,重庆400044 [3]郑州水利学校,河南郑州450008

出  处:《中国水土保持》2001年第12期29-30,共2页Soil and Water Conservation in China

摘  要:USLE是适用于估算缓坡农耕地多年平均土壤侵蚀量的模型 ,由于工程建设项目水土流失预测的时段及范围与USLE的适用条件有较大差别 ,经工程建设施工扰动的土体结构与农耕地的土壤结构有较大差异 ,因此工程项目施工引起的水土流失不能直接用USLE进行估算。USLE is a model of being applicable for estimating the average o f ma ny years soil erosion quantity of gentle sloped cultivated lands. Due to the pre dicting time interval and scope of soil and water loss during engineering constr uction are big difference with the applicable conditions of USLE and the disturb ed earth structure of engineering construction also has a bigger difference with the soil structure of cultivated lands, therefore, we can not directly use USLE to estimate the soil and water loss caused by engineering construction.

关 键 词:工程建设项目 水土流失量 USLE 适用性 估算模型 

分 类 号:S157[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象