黄河下游挖河固堤启动工程水文、泥沙原型观测资料分析  

Analysis on the Observed Data of Hydrology and Sedimentation for the Start-up Engineering of Channel Dredging and Dykes Strengthenning in the Lower Yellow River

在线阅读下载全文

作  者:周丽艳[1] 张东方 郭选英[1] 杨丽丰[1] 

机构地区:[1]黄委会勘测规划设计研究院,河南郑州450003 [2]黄委会水利科学研究院引黄灌溉局,河南新乡453003

出  处:《泥沙研究》2001年第6期51-54,共4页Journal of Sediment Research

摘  要:黄河下游窄河段挖河固堤启动工程于 1 997年 1 1月 2 3日在朱家屋子~清 2河段开始 ,这无疑是对黄河下游减淤途径的一种尝试。1 998年汛期对研究河段进行了水文、泥沙原型观测 ,本文主要从原型观测资料 ,分析挖河对水位、比降和河相关系等诸方面的影响。The initiative project of channel dredging and dykes strengthenning in the lower Yellow River started in the reach of Zhujiawuzi~Qing No.2 on the November 23, 1997.Without doubt, it is an attempt to reduce river deposition in lower Yellow River. The affect of river channel dredging on water level, slope, and the cross sectional shape, etc. was analyzed based on the field observation of hydrology and sedimentation in 1998 flood season.

关 键 词:原型观测 溯源冲刷 沿程冲刷 黄河 挖河固堤启动工程 淤积 

分 类 号:TV85[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象