检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜其慧[1] 裘嘉璞[1] 赵宝柱[1] 彭修聪[1] 王曰宝[1]
机构地区:[1]胜利油田有限公司孤岛采油厂
出 处:《油气地质与采收率》2001年第5期71-72,共2页Petroleum Geology and Recovery Efficiency
摘 要:孤岛油田中一区馆陶组 4开发单元 1997年 1月投入聚合物驱油 ,现已见到明显的降水增油效果 ,产油量由710t/d上升到 16 74t/d ,综合含水由 94.4%降至 86 .5 % ,累积增油 5 4.5 5× 10 4 t,2 0 0 0年 7月 2 0日转入后续水驱 ,目前正处于见效高峰期。对注聚期间油水井动态变化进行了研究 ,指出消除层间干扰、合理控制生产参数、提高注聚质量是改善聚合物驱油效果的重要技术措施。Polymer flooding was started in Jan. 1997 for Ng4 of Zhong 1 area in Gudao oilfi eld. Obvious effect for decreasing water and increasing oil production has been seen now, where the daily oil production is increased from 710t/d to 1674t/d, the composite water cut is decreased from 94.4% to 86.5% and cumulative incrementa l oil is 54.55×10~4t. Succeeding water flooding is carried put on July 20, 200 0 i n this area, and its effect is at the peak response stage . The changes of the o il-water well performances during the polymer injection are studied, and it is p ointed out that removing interlayer interference, controlling production paramet ers reasonably and improving the quality of the polymer injection are the import ant measures for improving the effect of the polymer flooding.
分 类 号:TE357.46[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.32