检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]洛阳石油化工工程公司,河南省洛阳市471003 [2]大连西太平洋石油化工有限公司,辽宁省大连市116600
出 处:《炼油设计》2001年第7期43-45,共3页Petroleum Refinery Engineering
摘 要:介绍大连西太平洋石油化工有限公司 2 .0Mt/a重油催化裂化装置主分馏塔的极限负荷试验情况。该分馏塔塔径 6 40 0mm ,内置 30层双溢流筛孔塔板。试验结果表明 ,该塔的负荷极限为 2 .47Mt/a ,欲将装置处理量提高至 2 .8Mt/a ,需将现有筛板更换为高性能塔板或填料。实际生产中 ,换热段塔板的操作上限可超出计算上限 ,而精馏段塔板的操作上限低于计算上限 。The limit test of processing capacity of the main fractionator of 200 000 0t/yr RFCCU in Dalian West Pacific Petrochemical Company was introduced.The main fractionator has a diameter of 6400 mm and 30 double flooding sieve trays.The results showed that its maximum processing capacity is 247 000 0 t/yr.To raise the capacity up to 280 000 0 t/yr,the sieve trays must be replaced by high efficiency trays or packings.In practical operation,the operation uplimit of trays in heat transfer zone can surpass the calculating uplimt,while the operation uplimt of trays in fractionating zone is lower than the calculating uplimit.
关 键 词:分馏塔 炼油 筛板塔板 极限负荷 试验 催化裂化
分 类 号:TE962[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200