检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河水利委员会勘测规划设计研究院,河南郑州450003
出 处:《人民黄河》2001年第10期11-12,共2页Yellow River
摘 要:在受水区缺水形势严峻的情况下,引水工程可调水量的确定主要与三个因素有关:一是引水河流及引水坝址径流量;二是坝址上下游用水要求;三是引水水库工程规模。在考虑各种因素影响后,提出各引水坝址可调水量占坝比径流量的比例在70%左右比较合适, 按现阶段推荐的两种方案, 可调水量可达160亿~170亿m~3.Under the condition of severe shortage in water resources in the water receiving zone, evaluation of the wa ter amount that can be diverted by the project of water diversion from the South to the North via the western course(the project called hereafter) is controlled by such three factors as the runoff at diversion dam sites, wa ter demand above and below the diversion dams, works scale of diversion reservoirs. Based on the effect of vari ous factors, it is concluded that it is suitable for the water volumes that can be diverted should be about 70 per cent of that at the dam sites. The water volumes to be diverted can be as much as 16 ~ 17 billions m~3 based on the two recommended schemes of the project.
分 类 号:TV68[水利工程—水利水电工程] TV211
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.188.86