检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:屠晓峰[1] 王海政[1] 丁大发[1] 唐梅英[1]
机构地区:[1]黄河水利委员会勘测规划设计研究院,河南郑州450003
出 处:《人民黄河》2001年第10期30-31,共2页Yellow River
摘 要:按照不同的供水范围和目标分析,南水北调西线第一期工程调水40亿m~3 ,产生的可定量计算的直接经济效益为248.01亿元,其中城镇供水经济效益、生态环境供水经济效益(含黄河干流补水经济效益)、水力发电经济效益分别为200、17.14、30.87亿元。根据不同的测算条件分析得出,调入黄河干流的水成本价为0.7~1.0元/m~3。On the analysis of the goals and the scope, the first stage project of water diversion from the South to the North via the western course is to divert 4 billions of water. It will yield 24. 8 billions Yuan(in RMB) of direct economic benefit that can be quantitatively calculated. The benefit can be broken down into 20 billions Yuan from the water supply to cities and towns, 1. 7 billions Yuan from the water supply for eco-environmental uses, which includes the water supply to the stem stream of the Yellow River, and 3. 087 billions Yuan from the wa ter supply for hydraulic power generation, respectively. The cost of the water delivered to the Yellow River is estimated to be 0. 7~1. 0 Yuan /m~3 based on the analysis of the conditions.
分 类 号:TV68[水利工程—水利水电工程] F426.9[经济管理—产业经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15