检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院,宜昌443002
出 处:《大坝观测与土工测试》2001年第4期20-21,26,共3页Dam Observation and Geotechnical Tests
摘 要:墓坪滑坡体是清江隔河岩水库库岸大型滑坡体之一,历史上曾多次发生过滑坡。为了监测水库蓄水前后该滑坡体的稳定性状态,通过在滑坡体上埋设钻孔倾斜仪和布设外部变形监测网点等监测手段来进行现场现测。监测成果表明:水库蓄水初期诱发地震导致了(墓坪)徐家台次级滑坡体的剧烈变形,对滑坡体整体稳定性产生了不良影响。As one of the large scale landslides in the Qingjiang reservoir bank area, the Muping landslide body slipped several times in history. Field observation methods, including inclinometers and surface deformation monitoring networks, have been used to monitor the stability of the landslide before and after inpoundment of the reservoir. Monitoring results indicate that the earthquake induced by impoundment in the initial stage resulted in the acute deformation of Xujiatai sub-landslide of the Muping landslide, which affected the stability of the landslide body.
分 类 号:TV697.39[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30