检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电》2001年第8期60-62,共3页Water Power
基 金:"九五"国家重点科技攻关项目 ( 96 2 2 1 0 4 0 2 )
摘 要:对动力优化、多目标优化、新体形及周边缝等的攻关研究 ,在已有的拱坝优化的基础上 ,从多拱梁优化发展到有限元优化 ,从静力优化发展到考虑地震荷载的动力优化 ,从单目标优化发展到双目标优化和多目标优化 ,发展和完善了我国提出的建立在拱坝优化的基础上的二次曲线及混合曲线拱坝新体形 ;使拱坝优化技术能适应高拱坝的体形设计 ,为小湾、溪洛渡等水电站的设计提供了参考 。The study on the dynamic optimization, multi objective optimization, new dam body shape and peripheral joint have been developed, on the basis of existing arch dam optimization, from multi arch beam to finite element optimization, from static optimization to dynamic optimization taking earthquake load into account, from single objective to double and multi objective optimization. This study develops and perfects, on the basis of arch dam optimization, the conic and mix curvature new shapes of arch dam body that were put forward by Chinese technicians. It enables the arch dam optimization technology to adapt to the shape design of high arch dam, provides the reference for the design of Xiaowan and Xiluodu hydropower stations, and keeps and enlarges the our leading position in the design of arch dam shape in the world.
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90