中放废液沥青固化装置热试验  被引量:1

HOT TEST OF THE BITUMIN SOLIDIFICATION FACILITY FOR INTERMEDIATE LEVEL OF RADWASTE

在线阅读下载全文

作  者:郑瑞堂[1] 张铁松[1] 顾胜德 顾连康[1] 黄永铙 徐素珍[1] 于承泽[1] 汪书卷[1] 黄卫岚[1] 

机构地区:[1]中国原子能科学研究院

出  处:《核科学与工程》1989年第1期66-75,7,共10页Nuclear Science and Engineering

摘  要:原子能院中放废液沥青固化装置采用蒸发予浓缩及双螺杆机混合蒸发处理流程,用本地区产生的中放蒸残液做料液进行了热试验,其中,蒸发器热运行191小时,双螺杆机热运行349小时,共处理中放蒸残液20.5吨,总放射性1.3×10^(11)贝可,得沥青固化产品45桶,主要技术指标基本达到设计要求,装置运行情况良好,产品出料温度控制在170℃以下是安全的。The hot test of hitumin solidification pilot-scale plant has been demonstrated with evaporator concentrates of 20.5 tons (total activity 1.3 x 10^(11) Bq) arising from the IAE, using the process of pre-concentration prior to feed and then mixed and evaporated in the twin-extruders. The evaporator and twin-extruders have been running for 191 and 349 hours respectively, and 45 drums of bituminized waste forms were obtained. The results obtained show that the main technical index of the pilot plant is able to meet the reqirements of original design. The operation of this system is good and safe while the outlet temperature is controlled below 170℃.

关 键 词:沥青固化装置 中放废液 热试验 

分 类 号:TL63[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象