管道全位置自动焊接施工技术  被引量:5

The Application of All-position Automatic Welding Technology in X70 Steel Pipe Welding

在线阅读下载全文

作  者:李军[1] 

机构地区:[1]中国石油天然气管道局第二工程公司

出  处:《油气储运》2001年第11期41-43,共3页Oil & Gas Storage and Transportation

摘  要:为了适应管道建设的发展,提高管道自动焊接技术水平,对多种焊丝和两种X70钢管进行了管道全位置自动焊接工艺试验和工艺评定。在试验段范围内,X射线拍片353道焊口,一次合格率达到96.9%,每道焊口电弧燃烧时间仅为35min,比手工焊的效率提高了30%~40%。介绍了管道全位置自动焊工艺特点和试验评定内容,对存在的问题进行了分析。The all-position automatic welding test on two kinds of X70 steel pipes and systematical electrodes and welding process evaluation have heen made in the 2nd Pipeline Construction Company of China Oil & Gas Pipeline Bureau. In the test. 353 welded seams taken from the trial pipe section have been X-ray in spected. The test results have shown that the primary percent of pass of welded seams is up to 96. 9%,and welding time for individual welded seam is only 35 min.which is 30%-40% higher than manual welding in work efficiency. The technical features and test evaluation guidelines of this welding technology are given in this paper.

关 键 词:自动焊接 油气管道 试验 施工技术 

分 类 号:TE973.9[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象