检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力公司中南勘测设计研究院,长沙410014
出 处:《水力发电学报》2001年第4期108-116,共9页Journal of Hydroelectric Engineering
摘 要:本文根据东江水电站建库前后的实地调查、观测结果 ,以及专题调查分析资料和成果 ,分析、总结了水库蓄水后生态环境诸因素 :诱发地震、库岸稳定、局地气候、水库水温与水质、水生生物、社会经济和人群健康等的变化 ,以期为水利水电工程环境影响评价和环境保护设计工作提供参考。This article analyses and summarizes the changes in such biological environmental factors as induced earthquake,bank stability,local climate,reservoir water temperature and water quality,aquatic organism,social economy and public health,etc.after reservoir impoundment,based on the findings of in\|situ investigation and observations before and after the reservoir establishment and with frespect to the achievements of subject inverstigation and analysis,in a hope to provide reference for environmental impact assessment and environmental protection design for water consevancy and hydropower projects.
关 键 词:生态环境 水电站 水库蓄水 变化分析 环境影响评价
分 类 号:X828[环境科学与工程—环境工程] X322
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15