小浪底水利枢纽工程排沙洞无粘结预应力混凝土施工  被引量:2

Construction of Sand Flushing Tunnel with Non-Binding Prestressed Concrete in Xiaolangdi Project

在线阅读下载全文

作  者:祖铁华 

机构地区:[1]中国水利水电第三工程局四分局,陕西安康725011

出  处:《水利水电科技进展》2001年第6期46-48,50,共4页Advances in Science and Technology of Water Resources

摘  要:介绍小浪底水利枢纽工程排沙洞无粘结双层环绕后张拉预应力钢筋混凝土施工中钢筋的加工及现场定位拼装 ,混凝土浇筑 ,锚具槽的施工 ,锚索的布置与张拉 ,锚索、锚具的防腐等施工工艺和工序 .该施工方案锚索安装精度高 ,张拉摩擦系数小 ,取消了预埋波纹管 ,减少了张拉、锚具槽回填的工作量 ,提高了施工控制水平 ,能确保施工进度和施工质量 .Introduced are techniques in tensioning of prestressed concrete for sand flushing tunnel construction in the Xiaolangdi Project, including manufacture and site installation of reinforcing steel, concrete pouring, anchorage slot construction, arrangement and tensioning of anchorage cables, and anti corrosive treatment of anchorage cables and anchorage devices. In the present scheme, the precision of anchorage cable installation is high, the tensioning friction coefficient is small, and the embedded corrugated pipe is eliminated. The technology may also help decrease the work load in tensioning of anchorage cables and backfilling of anchorage slot, improve construction control, and ensure construction progress and quality.

关 键 词:混凝土施工 预应力混凝土 无粘结预应力锚索 排沙洞 小浪底水利枢纽 

分 类 号:TV546[水利工程—水利水电工程] TV673.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象