检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]福州大学
出 处:《土木工程学报》2001年第6期60-62,共3页China Civil Engineering Journal
基 金:福建省新科技厅资助项目(2001H41)
摘 要:传统的位移反分析方法一般均需借助优化手段 ,本文尝试将人工神经网络这一新兴的非线性科学应用于基坑的位移反分析问题 ,以模拟基坑开挖的有限元程序为正演工具 ,以BP网络为反演工具 ,并通过样本的映射关系将正演和反演过程有机地结合起来。最后 。An attempt is made to propose a method to predicted the settlement of a deep foundation pit in the paper. The method is the displacement back?analysis combined with BP neural networks. It is reputed that the artificial neural networks are suited to solve the nonlinear problem. A plastic FEM program is used as a tool in the forward process. The BP neural network is adopted in the backward process. It is reasonably combined the forward and backward process through mapping the realtionship of samples. A multi?Staged excavation of a deep foundation pit can be simulated. Finally, a practical example has shown that the settlements of a deep foundation pit are agreement very well with that of the measurement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222