三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用  

Application of automatic control and measurement system in TGP-GP step power station model

在线阅读下载全文

作  者:董红燕[1] 柏林[1] 

机构地区:[1]长江科学院宜昌科学研究所,湖北宜昌443002

出  处:《长江科学院院报》2002年第1期56-58,共3页Journal of Changjiang River Scientific Research Institute

摘  要:三峡 -葛洲坝梯级电站联合调度水力学模型试验中 ,三峡电站下泄流量日变化幅度较大 ,葛洲坝电站反调节时流量大而水头较低。针对上述特点 ,分别采用不同的设计原理和控制方法 ,较好地解决了两电站流量的自动控制问题 ;针对两坝间及葛洲坝下游非恒定流水力学参数的测量 ,采用超声水位传感器和二维流速传感器实现了集中实时测量并自动处理输出 ,软件采用模块设计。整个系统简单、清楚、高效 。In the Three Gorges Project (TGP) Gezhouba Project(GP) step power station cooperation hydraulics model test, daily Changing amplitude of TGP power stations releasing discharge is large and that of Gezhouba Project in its reverse regulation is huge with low water head. Aiming at the above mentioned features, different design principles and control methods have been adopted respectively to solve the automatic discharge control problems for two power stations. For the measurement of unsteady flow hydraulics parameters in river between two dams and downstream Gezhouba reach, the supersonic water level sensors and two dimension velocity sensors were used to realize concentrative measurement in real time and automatic data processing. The software adopted modular design. The whole system is simple, clear and efficient. An application example for showing the automatic control and measurement is given.

关 键 词:实时监控 流量控制 水位 流速测量 梯级水电站 自动控制 

分 类 号:TV736[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象