检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院宜昌科研所,湖北宜昌443002 [2]长江勘测规划设计院,湖北武汉430010
出 处:《长江科学院院报》2001年第5期10-13,22,共5页Journal of Changjiang River Scientific Research Institute
摘 要:论述了三期明渠提前截流方案的综合比较分析及截流水力学试验研究成果。认为拟定的提前截流诸方案各有利弊 ,其截流难度较初设方案显著增加。对于截流“基本方案”及“比较方案”的成功实施 。The in advance closure schemes and their reasearch findings on Three Gorges Project's (TGP's) 3rd stage open channel closure are discussed in the article. It is considered that there are some advantages and disadvantages for every closure scheme, but their construction difficulties obviously increase than the original scheme. For successfully implementing the basic scheme and comparative scheme ahead of time, some measures to decrease the difficulties of closure must be adopted.
关 键 词:三峡工程 明渠封堵 提前截流 截流水力学 试验研究
分 类 号:TV551.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.215