检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李富[1] 安珍彩[1] 张良驹[1] 杨自觉[1]
机构地区:[1]清华大学核能技术设计研究院,北京100084
出 处:《核动力工程》2001年第6期508-512,共5页Nuclear Power Engineering
基 金:国家"863"计划能源重点项目。
摘 要:10MW高温气冷实验堆(HTR-10)验证与确认(VerificationandValidation,简称V&V)过程的特点是:和开发过程紧密配合,特别重视设计说明书的V&V、安全软件的V&V、系统功能的完整测试等环节。从而使数字化保护系统成功地通过安全审查并被批准应用于HTR-10上。The protection system installed in 10MW high-temperature-gas-cooled reactor (HTR-10) is the first digital protection system in China. The verification and validation (V and V) process to the digital protection system, which is the mandatory way to ensure its quality and reliability, is executed for the first time in China. The main characteristics of the development cycle is in a prototype way, commercial grade hardware is adopted, the safety software is separated from other supporting software to make the critical safety software easy to be tested. The corresponding verification and validation process is tightly coupled with every stage of the development, and the Vand V of the requirement and specification, V and V of safety software and the testing of the integrated protection system are the most important V and V activities. As a result, the digital protection system has been successfully passed the safety review and is licensed to be used in HTR-10.
关 键 词:10MW高温气冷实验堆 HTR-10 数字化保护系统 验证 确认 安全软件 测试
分 类 号:TL424[核科学技术—核技术及应用] TL362
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147