HTR-10全厂断电试验  被引量:1

Plant Power Cut-off Test of the HTR-10

在线阅读下载全文

作  者:孙卫东[1] 贾立新[1] 周世新[1] 玉辰生[1] 李江博[1] 孙中民[1] 陈光建[1] 

机构地区:[1]清华大学核能技术设计研究院,北京100084

出  处:《核动力工程》2001年第6期513-515,共3页Nuclear Power Engineering

基  金:国家"863"计划能源重点项目。

摘  要:10MW高温气冷实验堆在电气系统的设计中,针对全厂断电设计基准事故采取了相应的处理措施。在10MW高温气冷实验堆热态性能调试期间进行了全厂断电试验,用以验证10MW高温气冷实验堆应急供电系统的功能。结果表明,在发生全厂断电的设计基准事故时,由蓄电池组支持的不间断交流电源装置可以可靠地保证各专设安全设施完成其安全功能,并能为反应堆事故监测提供20小时的电力供应。The special process was utilized for the design basis accident of plant power cut-off in design of the HTR-10 power system. The plant power cut-off test was done in the course of the HTR-10 hot testing in order to verify the function of the HTR-10 emergency power supply system. The result of the experiment has shown that the UPS, supplied by the battery, can ensure all engineered safety features to finish their safety function reliably and can supply 20 hours power energy for the demand of the HTR-10 accident supervision and measurement.

关 键 词:10MW高温气冷实验堆 全厂断电试验 设计基准事故 事故监测 电气系统 设计 安全系统 应急供电系统 

分 类 号:TL364[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象