HTR-10控制棒系统的试验与调试  被引量:6

Verification Test of Control Rod System for HTR-10

在线阅读下载全文

作  者:周惠忠[1] 刁兴中[1] 黄志勇[1] 曹丽[1] 杨念祖[1] 

机构地区:[1]清华大学核能技术设计研究院,北京102201

出  处:《核动力工程》2002年第1期41-44,共4页Nuclear Power Engineering

基  金:国家"863"计划能源重点项目

摘  要:10MW高温气冷实验堆共有10套控制棒组件及其驱动机构,用于高温堆启动、功率运行和停闭过程中补偿和调节所需的反应性变化,并保证足够的停堆裕度。为确保达到工程设计的要求,对全部控制棒组件及驱动机构,都在实验室进行了热态试验,在高温堆上进行了安装后调试、以及首次临界前的测试。各项数据表明,所有驱动机构运行良好,控制棒的提棒、落棒运行功能正常,位置保持功能正常,棒位显示准确。There are 10 sets of control rods and driving devices in 10 MW High Temperature Gas-cooled Test Reactor (HTR-10). The control rod system is the controlling and shutdown system of HTR-10, which is designed for reactor criticality, operation, and shutdown. In order to guarantee technical feasibility, a series of verification tests were performed, including room temperature test, thermal test, test after control rod system installed in HTR-10, and test of control rod system before HTR-10 first criticality. All the tests data showed that driving devices working well, control rods running smoothly up and down, random position settling well, and exactly position indicating.

关 键 词:高温气冷堆 控制棒 驱动机构 热态试验 HTR-10 传动机构 调试 

分 类 号:TL424[核科学技术—核技术及应用] TL362.6

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象