江苏燃气轮机电厂LNG接受站工程方案设计  被引量:1

Design for the Project of LNG Receiving Station of Jiangsu Gas Turbine Plant

在线阅读下载全文

作  者:杨希宏[1] 吴荔丹[1] 张本立[1] 

机构地区:[1]第一航务工程勘察设计院,天津300222

出  处:《中国港湾建设》1999年第5期3-13,共11页China Harbour Engineering

摘  要:江苏燃气轮机电厂LNG接受站工程由供126 400m 3LNG船专用的航道、港池、码头和供布置LNG工艺管系、设备、设施之用,为LNG储存、气化、转供燃料、现场管理人员生活提供陆域的人工岛以及连接它们的栈桥等部分组成。本文仅就该接受站中有关港口工程和人工岛工程的设计原则和方案比选进行初步探讨。The project of the LNG(Liquefied Natural Gas) receiving station of Jiangsu Gas Turbine Plant mainly consists of the parts, including 126,400m 3 of the special navigation channel for a LNG vessel, basins, berths and an artificial island for the arrangement of the LNG pipe system, equipment and plant, and for the storage of LNG, gasfication, fuel supply, and provide a land area for the service of the in situ management personnel, and the connection of jetties and piers, etc.This paper only describes the initial discussion on the comparison and selection of the design criteria and the proposal related to the port works and artificial island engineering of the LNG receiving station.

关 键 词:液化天然气 储存 设备 设计 港口工程 人工岛工程 方案比选 LNG接受站 

分 类 号:U653[交通运输工程—港口、海岸及近海工程] TE83[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象