作 者:马震岳[1] 沈成能[1] 王溢波[1] 陈婧[1] 赵德海[1] 路振刚[2] 王广成[2] 戴正[2] 赵纯经[2] 杨琦[2]
机构地区:[1]大连理工大学土木建筑学院,辽宁省大连市116024 [2]白山发电厂,吉林省桦甸市132404
出 处:《水力发电学报》2002年第1期28-36,共9页Journal of Hydroelectric Engineering
摘 要:红石水电站机组振动诱发厂房振动 ,造成厂房立柱开裂。通过系统的数值分析与试验研究 ,结论认为 ,振源为机组与厂房共振。在此基础上 ,提出了厂房抗振加固方案。本文对加固方案进行了计算和试验探讨 ,从避免共振、提高厂房结构刚强度、以及保证厂房运行安全的目标出发 ,提出抗振加固的设计方案 ,并对实施后的效果进行了分析论证。In Hongshi Hydropower Station there exists vibration of units and induced vibration of powerhouses and dams. It is concluded through the numerical and experiment research that the source of heavier vibration is due to the resonance between the units and the structures, which has caused the cracking of columns. Based on the research works, some proposals have been put forward to reinforce the powerhouse.After the measures are taken, the vibration frequency of the structure becomes much higher than the rotating speed of the units, so the resonance can be avoided. The amplitude of the structure vibration is also decreased remarkably.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.222.68