溪柄碾压混凝土薄拱坝运行期位移预测和实测  被引量:1

Displacement Forecast and Measurement in Situ during Operation for Xibing Roller Compacted Concrete Thin Arch Dam

在线阅读下载全文

作  者:刘光廷[1] 叶源新[1] 

机构地区:[1]清华大学水利水电工程系,北京100084

出  处:《水力发电学报》2002年第E01期34-38,共5页Journal of Hydroelectric Engineering

基  金:清华大学"985"重点项目基金资助

摘  要:溪柄碾压混凝土薄拱坝设计采用了仿真的材料热学参数。这些参数是在预测的施工温度条件下进行的材料实验中测定的。设计模拟了施工全过程 ,进行坝体的累计温度及自重徐变应力计算 ,提供施工期末初应力。本文提供运行期某一时刻水压和温度下相对施工期末的简易计算位移 ,并把计算值和短系列的原型观测数据进行比较修正。上述两者应力叠加即为该时全应力值。Experimental thermal parameters of concrete material considering the temperature conditions during construction were used in the design of Xibing Roller Compacted Thin Arch Dam. The creep stresses computation of accumulated temperature and self weight according to construction process gives the initial stresses at the end of construction. In present paper the displacements by simple evaluation corresponding to the change of water levels and temperatures during operation and the end period of construction is given. Compared and modified the computational results with short series of displacements measured in situ. To sum up the two kinds of aforementioned stresses (or displacements) the total stress of dam is obtained. The dam is unsafe if the displacement changes suddenly or moves too much toward downstream.

关 键 词:位移 稳定温度场 边界条件 碾压混凝土 薄拱坝 预测 

分 类 号:TV642.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象