检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贺婷[1] 令狐延[1] 叶浩文[1] 李松晏[1] 黄炼丹 HE Ting;LINGHU Yan;YE Haowen;LI songyan;HUANG Liandan(China Construction Fourth Engineering Division Co.,Ltd.,Guangzhou,Guangdong 510665,China)
机构地区:[1]中国建筑第四工程局有限公司,广东广州510665
出 处:《施工技术》2018年第22期147-151,共5页Construction Technology
摘 要:根据多年施工总承包管理经验,总结出一套LSCS总承包管理体系。LSCS总承包管理体系强调以项目整体利益最大化为中心,通过引领、服务、协调、监管等手段提高项目的精细化管理水平,破解施工总承包管理的系统性、多维性、复杂性与动态性管理难题,最终实现各方共赢。LSCS construction primary contractor management system is put forward based on years of experience of construction primary contractor management under the background of construction new era. The project benefits maximization is emphasized through "Leading, Servicing, Coordination and Supervision" in order to raise the level of refined management and solve systematic, multi-dimensional, complex and dynamic problems of construction primary contractor management, finally achieve win-win.
关 键 词:工程管理 工程总承包 建筑信息模型 绿色施工 可持续发展
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145