检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐寒[1] XU Han(Central Research Institute of Building and Construction Co.Ltd,MCC Group,Beijing 100088,China)
机构地区:[1]中冶建筑研究总院有限公司
出 处:《工业建筑》2018年第11期122-126,105,共6页Industrial Construction
摘 要:2022年北京冬奥会新建的国家速滑馆“冰丝带”和国家雪车雪橇中心工程,结构体系复杂,桩基础承受的荷载较大。为了给奥运场馆提供合理可靠的建设方案和技术参数,在施工前开展了原位足尺桩基承载力试验。通过对国家速滑馆工程和国家雪车雪橇工程试桩试验结果的分析,对卵石地层条件下后压浆工程桩提出了控制要求,对山区复杂地基情况下人工挖孔桩的桩长控制提出了建议。The projects of the new National Speed Skating Hall called "Ice Ribbon"and the National Snowmobile & Sled Center for XXIV Olympie Winter Games in Beijing are of complex structure system,and the design bearing capacties of pile foundations are very large.In order to provide reliable construction plans and technical parameters, the full-scale field tests of pile foundation were carried out before construction.Analyzing the test piles static loading test results for the two projects,the control requirements for post grouting engineering pile under the condition of pebble stratum were put forward,and the pile length of manual post hole digging pile under the condition of complex foundation in mountain area was suggested.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229